« Trim work nearly complete - lower cabinets mounted | Main | Things are starting to look really great »

Final week of construction?

This could be the last week of construction for the basement project. Tiling is finishing up, painting should be done in a day or so. Plumbing and electrical by mid-week. The carpet is getting installed on Wednesday and we should have the final inspection by the end of the week.
Last Friday had the walk through with my A/V experts who are doing the screen install, projector mounts and speaker mounts.

Here are the latest pictures:

IMG_2082.JPG
Ceiling is installed and the upper cabinets have been mounted.

IMG_2083.JPG

Rails on stairway are corrected and trim is being painted

IMG_2084.JPG

Trim is finished, windows painted

IMG_2085.JPG

The long awaited tile job in the bathroom. It will be grouted this monday.

IMG_2086.JPG

Another view of the cabinets and ceiling, This hallway connects the bar/poker area to the movie theater area

IMG_2087.JPG

A view of the poker area and the bar area.

I should have more photos later this week with the carpet installed.

Geof's iTunes currently playing Wake Me Up When September Ends from the album "American Idiot" by Green Day

Get Firefox!

TrackBack

TrackBack URL for this entry:

Post a comment